Thu Thiem 2 Bridge is a cable-stayed road bridge currently under construction across the Saigon River, connecting District 1 with Thu Duc City in Ho Chi Minh City, Vietnam. The bridge is expected to be completed in which year and what is its location and scale? Let’s find out more in the article below with AVA.
When will the construction of Thu Thiem 2 Bridge be completed?
Due to land clearance issues, the contractor was unable to install the cable-stayed section connecting the final span of the bridge, which is necessary to open the main bridge from District 1 to Thu Duc City. The Department of Planning and Investment of Ho Chi Minh City has submitted a report to evaluate the adjusted construction project of Thu Thiem 2 Bridge.
Adjusting the completion timeline of the construction project for Thu Thiem 2 Bridge to 2023 is deemed appropriate for it to become operational. This is to ensure compliance with the requirements of the State Audit. Within one year, the investor will complete the construction project when they are provided with vacant land.
Location of Thu Thiem 2 Bridge
Thu Thiem 2 Bridge has its starting point at the intersection of Le Duan and Ton Duc Thang, along Ton Duc Thang Street in District 1, crossing the Saigon River and connecting to the Arc Road in the new Thu Thiem urban area.
Once completed, Thu Thiem 2 Bridge – Luong Dinh Cua Street – Arc Road will create a new traffic flow, directly connecting from the center of District 1 to the Long Thanh – Dau Giay Expressway. Specifically, from Le Duan, District 1 – Thu Thiem 2 Bridge – Arc Road – Luong Dinh Cua Street – An Phu interchange (and vice versa).
Scale of Thu Thiem 2 Bridge project
Thu Thiem 2 Bridge spans across the Saigon River with a total length of 1.4 km, featuring 6 lanes: 4 lanes for cars and 2 lanes for mixed traffic, including 3 bridge branches:
The main branch, with a length of 437m, has 4 lanes for straight travel, passing through the intersection of Le Thanh Ton – Nguyen Huu Canh, connecting the Ton Duc Thang – Le Duan routes.
Branch N2, with a length of 192.7m, connects District 1 to District 2, descending to Ton Duc Thang Street before the intersection of Le Thanh Ton – Nguyen Huu Canh.
Branch N1, with a total length of 195.5m, starts from Me Linh Square running along Ton Duc Thang Street, following the Saigon River and connecting to the main bridge, passing through the new Thu Thiem urban area.
Featuring a design style inspired by the Dragon Bridge and a cable-stayed bridge with a main tower height of 113m, leaning towards the new Thu Thiem urban area, Thu Thiem 2 Bridge will be a prominent architectural landmark on the Saigon River, visible both day and night.
The article on AVA has provided readers with comprehensive and clear information about the progress of completion, location, and scale of Thu Thiem 2 Bridge.
AVA - CONSUMER SHOPPING, HEALTH AND LIFESTYLE, INFORMATION LOOKUP, SPORTS NEWS.
Related posts
What is Valentine’s Day, and what is the meaning behind this sweet holiday?
Every Valentine’s Day, sweet couples celebrate, exchange gifts, and express their love for each other. [...]
Sep
What is Pet Food and Its Role
Just like humans, pets require a daily intake of food to ensure they receive all [...]
Sep
What Is a Credit Card? Benefits of Using a Credit Card
A credit card is a financial product provided by banks to customers who wish to [...]
Sep
What is Live Streaming? A Guide on How to Live Stream
Many people want to know what live streaming is and why more and more store [...]
Sep
What is Barcode Scanning Software? Popular Applications
Currently, in the market, the status of genuine and counterfeit goods is mixed, so customers [...]
Sep
Commonly Used Top 11 Flight Booking Apps Today
Booking flights through your phone or computer has become increasingly popular. You no longer need [...]
Sep